  • We Bagged,2 Laning from Pasighat to Pangin Section of NH -229 (New NH-13) from km.41.30 to km.58.42 (Existing km 42 to km 59) (Length 17.12 km) in Arunachal Pradesh Package of SARDP-NE

  • We Bagged Four Laning of NH-52 end of Biswanath Chariali by Pass(km .208.00) to Gohpur (Km.265.00) (Total Length 57.50 KM) in the State of Assam on EPC basis,SARDP-NE

  • We Bagged 2 Laning existing Akajan - Likabali bame road on EPC basis from design km.33.000 to km.65.810 (Existing km.36.000 to Km.71.000) in the State of Arunachal Pradesh

  • Popum Puma (Ramghat Tarasu)

  • We Bagged,2 Laning from Changlang / Tirap District Boundary to Changlang of NH 52 B (New NH215) (Length 18.27 KM) in Arunchal Pradesh on EPC mode under Arunachal Pradesh ,Package of SARDP-NE

  • Hydro Power Project (Arunachal Pradesh)

  • 2 Lanning of Pasighat-Pangin Road (NH-229) from Km 28 to Km 41.30

  • North Lakhimpur Bypass from existing km 338/924 to km 349/923 of NH 52 in the state of Assam

  • 4 Lanning from Holongi to Itanagar (Total 19.20 km) (NH-52A) in Arunachal Pradesh Phase ''A'' under SARDP-NE

  • Infrastructure Development works at Pasighat Airport

  • Infrastructure Development works at Along Airport

  • Infrastructure Development works at Mechuka Airport

  • Infrastructure Development works at Ziro Airport

  • Infrastructure Development works at Walong Airport

  • Widening of existing road 2 lane NH Standards along with improvements and realignments from Nechipu to Hoj, via Seppa, Khodaso, Sagalee (Part of Trans Arunachal Highway )in Arunachal Pradesh under Arunachal Pradesh Package of roads and highways on National Highway No.229 on Design. Build. Finance,operate and transfer (DBFOT) Annuity bassis (From km 0+000 to 311+000)

  • 4 Laning of Holongi to Itanagar (NH-52A)(total 19.20 Km) in the state of Arunachal Pradeh under Phae A of SARDP-NE.]

  • Double laning of Papu-Yupia -Hoj-Potin road from Km 0.00 to Km 53.00 in the state of Arunachal pradesh under SARDP-NE. (Package – A:Hoj- Potin section from Km 0.00 to Km 10.00).

  • Double Laning of Papu-Yupia-Hoj- Potin Road from Km 0.00 to Km 53.00 in the State of Arunachal Pradesh under SARDP-NE. (Package – B : Yupia-Hoj Section from Km 10.00 to Km 32.00)

  • Double laning of Papu-Yupia -Hoj-Potin road from Km 0.00 to Km 53.00 in the state of Arunachal pradesh under SARDP-NE. (Package – C: Hoj- Potin section from Km 32.00 to Km 53.00).

  • Double laning of Pasighat-Pangin Road (NH-229) from Km 57.00 to Km 71.596 (Corresponding to existing km 59.00 t0 76.00) (Net length =14.597 km) the State of Arunachal Pradesh under Arunachal Package of Roads & Highways, Package IV.

  • 2-laning from Pasighat to Pangin Section of NH-229 (New NH-13) from km 41.3 to km 58.42 (existing km 42 to km 59) (Length 17.12 Km) in Arunachal Pradesh under Arunachal Pradesh Package of SARDP-NE.

  • 2 Laning Road from Changlang Tirap District Boundary to Changlang of NH-52B (New NH- 215) from km 0.00 to km 18.266(Length-18.266 km.) in Arunachal Pradesh on EPC mode under Arunachal Pradesh Package of SARDP- NE on EPC basis.

  • 2-Laning of Existing Akajan Likabali Bame Road on EPC basis from design km. 33.000 to km. 65.810 (existing 36.000 TO KM. 71.000) in the State of Arunachal Pradesh under SARDP-NE project.

  • Four Laning of NH 52 from end of Biswanath Chariali by-pass (Km 208.00) to Gohpur (Km 265.50) (Total Length = 57.50 km) in the state of Assam on EPC Basis Project. [Total value of contract is Rs. 829.00 Crore in the name of Ramky-TK (JV) on 70:30 ratio, where Ramky's portion is 70% and TK's portion is 30%]

  • Four Laning of NH-37 from Nagaon to Rangagara (Km 278.600 to Km 297.000 Km) in Nagaon District in the State of Assam under SARDP-NE, Phase A on EPC mode.

  • Construction of Outdoor Stadium at Aalo, Chimpu and Tezu in Arunachal Pradesh

Welcome To TK Engineering Consortium Pvt. Limited

T.K. Engineering Consortium Pvt. Ltd. is a well-organized company that deals in offering Road Construction Services and other services to our esteemed clients. Based in Arunachal Pradesh (Itanagar) from India, our company have till now accomplished a strong reputation within our marketplace for accomplishing complex projects and for rendering the best services to our esteemed customers from worldwide. Our approach to construction management and its reasonable cost have assisted the company to provide projects in limited time period, by sticking to strict quality control measures.

Empowered as one of the pre-eminent Highway Construction Company from Arunachal Pradesh (India), we are self-possessed to extent new targets in near future.

Read More

Ongoing Projects

Chairman Message

We take pride in being one of the pioneer engineering and contracting firms in North-East India having achieved remarkable growth over the last three decades and contributing significantly to the development of North-East. The Company has attained prominence as a leader in the field of construction and engineering through competence, competitiveness and timely delivery with highest quality stan

Read More
  • T.K. Engineering Consortium Pvt. Ltd. was organized in the year 1990 in Itanagar (Arunachal Pradesh, India) and very soon it experienced the metamorphism from elementary engineering governance to the preceding construction orga

    Read More

  • In 2007-08, this was an epoch of alteration and reorganization as our company prepared itself to match the challenges of a new century. Our company has till now fused its perspective in the ordering of big projects and gaining adjures for numerous others.

    Read More
  • For delivering the top-notch quality services to our customers and to surpass client prospects
    For attaining our aim and objectives is the foremost priority
    One of the best incorporated infrastructure project
    Read More

Awards & Achievements
TK Engineering Consortium wins Vishwakarma Award

TK Engineering won award in gold category during the international quality crown award function held at London, United Kingdom

Our Projects

  • Ziro alg site
    Road changlang tirap changlang
    Pasighat to pangin
    Pasighat alg site
    Construction of 6 Nos Advance Landing ground ALG in Arunachal Pradesh at the following locations
    Package II and IV pasighat
    Outdoor stadium at aalo chimpu and tezu
    NLP by pass project
    Nagaon to rangagara assam
    ITA hilongi 4 lane site
    Existing akajan likabali bame road
    Biswanath chariali by pass to gohpur
  • NLP by pass project
    Ziro alg site
    Pasighat alg site
    ITA hilongi 4 lane site
    Pappu yupia package A
    Package II and IV pasighat
    Pappu yupia package B
    Pasighat to pangin
    Road changlang tirap changlang
    Existing akajan likabali bame road
    Biswanath chariali by pass to gohpur
    Nagaon to rangagara assam
    Outdoor stadium at aalo chimpu and tezu
    Construction of 6 Nos Advance Landing ground ALG in Arunachal Pradesh at the following locations

Our Clients