Projects

T.K. Engineering Consortium Pvt. Ltd. handles extensive Construction Projects in Papumpare (India) that have become a one of the foremost part of the natural landscape for the construction of bridges, airport runways and highways.

S.No Current Projects
1.

Widening of existing road 2 lane NH Standards along with improvements and realignments from Nechipu to Hoj, via Seppa, Khodaso, Sagalee (Part of Trans Arunachal Highway )in Arunachal Pradesh under Arunachal Pradesh Package of roads and highways on National Highway No.229 on Design. Build. Finance, operate and transfer (DBFOT) Annuity bassis (From km 0+000 to 311+000)

2.

Infrastructure Development works at Pasighat Airport,

3.

Infrastructure Development works at Along Airport

4.

Infrastructure Development works at Mechuka Airport

5.

Infrastructure Development works at Ziro Airport

6.

Infrastructure Development works at Walong Airport

7.

Infrastructure Development works at Tutting Airport

Being a renowned Builder from India, We undertake various commercial and industrial projects that are constructed properly as per the requirements of clients. Hence, our clients have been a major partner in every Commercial Construction projects, finding out optimum services and utmost performances at every step of the way.

Today, we are managing various projects that are specified briefly as below:

  • 2 Lanning of Pasighat-Pangin Road (NH-229) from Km 28 to Km 41.30 (Corresponding to Existing Km 28.0 to Km 42.0)
  • 2 Lanning of Pasighat-Pangin Road (NH-229) from Km 57 to Km 71.596 (Corresponding to Existing Km 59.0 to Km 76.0)
  • 4 Lanning from Holongi to Itanagar (Total 19.20 km) (NH-52A) in Arunachal Pradesh Phase ''A'' under SARDP-NE''
  • Double Lanning of Papu-Yupia-Hoj-Potin Road from Km 0.00 to Km 53.00 in the State of Arunachal Pradesh under SARDP-NE'' (Package-A: Papu-Yupia Section from Km 0.00 to 10.00)
  • Double Lanning of Papu-Yupia-Hoj-Potin Road from Km 0.00 to Km 53.00 in the State of Arunachal Pradesh under SARDP-NE'' (Package-B: Yupia-Hoj Section from Km 10.00 to 32.00)
  • Double Lanning of Papu-Yupia-Hoj-Potin Road from Km 0.00 to Km 53.00 in the State of Arunachal Pradesh under SARDP-NE'' (Package-C: Hoj-Potin Section from Km 32.00 to Km 53.00)
  • North Lakhimpur Bypass from existing km 338/924 to km 349/923 of NH 52 in the state of Assam

Some of the Major Projects Completed by T.K. Engineering Consortium Pvt. Ltd. under road sector:

Some of the Major Projects Completed by the company under road sector:

S.No Name of Project Road Length (in KM)
A

4 Lane Road Project

 

1.

4 Laning of Holongi to Itanagar (NH-52A) (total 19.20 Km) in the state of Arunachal Pradesh under Phase A of SARDP-NE.

19.200

 
Total Length of Completed 4 Lane Road =

19.200

B

2 Lane Road Project

 

1.

Double laning of Papu-Yupia -Hoj-Potin road from Km 0.00 to Km 53.00 in the state of Arunachal Pradesh under SARDP-NE. (Package – A: Papu-Yupia section from Km 0.00 to Km 10.00).

10.000

2.

Double Laning of Papu-Yupia-Hoj- Potin Road from Km 0.00 to Km 53.00 in the State of Arunachal Pradesh under SARDP-NE. (Package – B: Yupia-Hoj Section from Km 10.00 to Km 32.00)

22.000

3.

Double laning of Papu-Yupia -Hoj-Potin road from Km 0.00 to Km 53.00 in the state of Arunachal pradesh under SARDP-NE. (Package – C: Hoj- Potin section from Km 32.00 to Km 53.00).

21.000

4.

Double laning of Pasighat-Pangin Road (NH-229) from Km 28.00 to Km 41.303 (Corresponding to existing km 28.00 to 42.00) (Net length =13.303 km) the State of Arunachal Pradesh under Arunachal Package of Roads & Highways, Package II.

13.303

5.

Double laning of Pasighat-Pangin Road (NH-229) from Km 57.00 to Km 71.596 (Corresponding to existing km 59.00 t0 76.00) (Net length =14.597 km) the State of Arunachal Pradesh under Arunachal Package of Roads & Highways, Package IV.

14.596

 
Total Length of Completed 2 Lane Road =

80.899

 
GRAND TOTAL LENGTH OF COMPLETED ROAD

100.099


Construction of 6 Nos. Advance Landing ground (ALG)in Arunachal Pradesh at the following locations(Under Ministry of Defense):

S.No Project Location Runway Length (in Km) Remarks
1.

WALLONG

0.700

Completed & Inaugurated on 23/10/2015

2.

AALO

1.000

Completed & Inaugurated on 08/03/2016

3.

ZIRO

1.200

Completed & Inaugurated on 26/03/2016

4.

MECHUKA

1.400

Completed & Inaugurated on 31/05/2016

5.

PASIGHAT

2.000

Completed & yet to be inauguration

6.

TUTING

1.400

In Progress – 85% Completed

 

TOTAL LENGTH

7.700 KM

 

Some of the Major Ongoing Road Projects undertaking by T.K. Engineering Consortium Pvt. Ltd.

Some of the Major Projects Completed by the company under road sector:

S.No Name of Project Road Length (in KM)
A

4 Lane Road Project

 

1.

Four Laning of NH 52 from end of Biswanath Chariali by-pass (Km 208.00) to Gohpur (Km 265.50) (Total Length = 57.50 km) in the state of Assam on EPC Basis Project.

  • Project was awarded in the name of Ramky-TK (JV) on 70:30 ratio, where Ramky's portion is
  • 70% and TK's portion is 30%
  • Entire work is now executing by TK on 100% back to back basis on behalf of the Joint Venture.

57.500

 

Four Laning of NH-37 from Nagaon to Rangagara (Km 278.600 to Km 297.000 Km) in Nagaon District in the State of Assam under SARDP-NE, Phase A on EPC mode.

18.400

 
Total Length of Ongoing 4 Lane Road =

75.900

B

2 Lane Road Project

 

1.

2 Laning Road from Changlang – Tirap District Boundary to Changlang of NH-52B (New NH- 215) from km 0.00 to km 18.266(Length-18.266 km.) in Arunachal Pradesh on EPC mode under Arunachal Pradesh Package of SARDP- NE on EPC basis.

18.266

2.

2-laning from Pasighat to Pangin Section of NH-229 (New NH-13) from km 41.3 to km 58.42 (existing km 42 to km 59) (Length 17.12 Km) in Arunachal Pradesh under Arunachal Pradesh Package of SARDP-NE.

17.120

3.

2-Laning of Existing Akajan Likabali Bame Road on EPC basis from design km. 33.000 to km. 65.810 (existing 36.000 TO KM. 71.000) in the State of Arunachal Pradesh under SARDP-NE project.

32.810

4.

Rehabilitation of Lowairpoa Kanmun Road (KJ-M-7) under Assam State Roads Project, Package No. ASRP/REH/NCB/12

27.400

5.

Widening of existing road to 2 lane NH Standards along with improvement and re-alignment from Potin to Pangin, via Yachuli, Ziro, Daporizo, Aalong (total length = 407 Km) (part of Trans Arunachal Highway) on BOT (Annuity) basis under Arunachal Pradesh Package of SARDP-NE.

407.000

 
Total Length of Ongoing 2 Lane Road =

502.596

 
GRAND TOTAL LENGTH OF ONGOING ROAD

578.496